|
|
 |
| |
|
|
|
| |
| Installation - Retaining Walls |
| 1.
Foundation |
Place
solid concrete blocks or Universal curb blocks in a level
position on the compacted surface to support the first
series of risers. The surface of these blocks must be
flush with the surface of the pavers. |
| 2. First
Riser |
Install the first
series of risers. Fill in the space behind the risers
with crushed stone and compact well. Suggestion: To alternate
joints, split the riser in two. |
| 3. First
Step |
Install the first
step module on top of the riser, taking care to insert
the square anchor. NOTE: It is important to glue the riser
and step modules together with a concrete adhesive. |
| 4.
Following rows |
Repeat steps
1,2 and 3 until desired height is reached. |
|
|
| |
| For
More Information call: 800-649-8782 |
| |
|